Home
What we offer
Product catalogue
Site evaluation
Disclaimer
Contact us
e-mail me

Site hydro evaluation report (please review the background picture first)

Full name *
Email address *
Telephone *
Reservoir water elevation [meter above sea level] *
Reservoir water volume [m3] *
Is the reservoir level control required ? *
Penstock pipe diameter [mm]
Penstock pipe length [m]
Penstock pipe material (rusted steel, etc.)
Turbine elevation [masl] *
Tail race water elevation [masl] *
Maximum (rated) turbine flow [liter/sec.] *
Maximum flow annual duration [%] *
Average turbine flow [l/sec.] *
Average flow annual duration [%] *
Minimum turbine flow [l/sec.] *
Minimum flow annual duration [%] *
Network type (grid or island operated) *
Network data (1/3~220/380 Vac, 50/60 Hz) *
Project location (city, country) *
Offer for turbine + generator needed ? *
Offer for inlet & safety valves needed ? *
Offer for automation needed ? *
Your role in the project (owner, consultant, etc.) *
Project stage (phesability, purchasing, etc.) *
Message to the evaluator
Do you accept to enter our newsletter group ? *