Site hydro evaluation report (please review the background picture first)
Full name
*
Email address
*
Telephone
*
Reservoir water elevation [meter above sea level]
*
Reservoir water volume [m3]
*
Is the reservoir level control required ?
*
Yes
No
Penstock pipe diameter [mm]
Penstock pipe length [m]
Penstock pipe material (rusted steel, etc.)
Turbine elevation [masl]
*
Tail race water elevation [masl]
*
Maximum (rated) turbine flow [liter/sec.]
*
Maximum flow annual duration [%]
*
Average turbine flow [l/sec.]
*
Average flow annual duration [%]
*
Minimum turbine flow [l/sec.]
*
Minimum flow annual duration [%]
*
Network type (grid or island operated)
*
Network data (1/3~220/380 Vac, 50/60 Hz)
*
Project location (city, country)
*
Offer for turbine + generator needed ?
*
Yes
No
Offer for inlet & safety valves needed ?
*
Yes
No
Offer for automation needed ?
*
Yes
No
Your role in the project (owner, consultant, etc.)
*
Project stage (phesability, purchasing, etc.)
*
Message to the evaluator
Do you accept to enter our newsletter group ?
*
Yes
No
© Copyright 2008 VARSPEED Hydro Ltd. All rights reserved.
|
Home
|
|
What we offer
|
|
Product catalogue
|
|Site evaluation|
|
Disclaimer
|
|
Contact us
|