|
While large power units can only be connected to the national grid, small units can work in island networks too, with variable speed MAS or ELC (electronic load control) automation. Adequately structured MAS variant (with storage batteries, ballast load controller, softstarter, variable speed drive, etc.) will be supplied depending on the site characteristics, generator and network type. |